Gronomics PB 18-18S Instrukcja obsługi

Typ
Instrukcja obsługi

Niniejsza instrukcja jest również odpowiednia dla

www.gronomics.com East Bethel, MN USA 763-753-7374
Continued
ITEM QTY.
1 4 1900P
2 2 1452T
3 5 1450T
4 1
5 4 1451T
6 2
1538NR
7 1 1538
8 4 4545
9 1 FL3652
Corner Post, 4” x 4” x 19”w/2 dovetailed sides 12-3/4
Side Rail w/Cleat, 14-1/2” x 5-1/2” x 7/8
Side Rail, 14-1/2” x 5-1/2” x 7/8
Side Rail, (one w/Logo), 14-1/2” x 5-1/2” x 7/8
Narrow Center Side Rail, 14-1/2” x 2-1/2” x 7/8
Corner Notched Bottom Board, 15-3/8” x 4-1/2” x 1”
Bottom Board, 15-3/8” x 5-1/2” x 1”
Post Cap, 4-5/8” x 4-5/8” x 1-1/2”
Fabric Liner, 36"x 52"
Planter Box (18” x 18”)
Assembly Instruction
1
Parts Identi cation
Stack matching pieces in piles. Using the parts
list, locate and count the individual pieces and
verify that you have received the correct number
of pieces.
If any pieces are missing or replacement parts are
required, contact Gronomics at 1-855-299-6727.
NOTE: Ground preparation is optional, however
we recommend leveling area under frame of
product, or place product directly on a flat level
surface before filling with soil.
Item #: PB 18-18
Item #: PB 18-18S
1
2
3
4
5
6
7
8
9
Side Rail Assembly
2
Stand two 4” x 4” x 19” corner posts (Item 1) upright with slots facing each post and slots
facing you.
Locate a 14-1/2” x 5-1/2” side rail w/cleat (Item 2). With cleat located at the bottom and
facing you, install side rail w/cleat into the slots and slide down to the bottom of the slots.
Repeat procedure for the two remaining 4” x 4” x 19” corner posts and 14-1/2” x 5-1/2”
side rail w/cleat.
(Soil depth option: Cleats located as shown will provide a soil depth of
approximately 10”. Reverse side rail w/cleat installation, cleats located at
top, if a soil depth of approximately 6” is desired).
Cleat
2
1
1
Packaged & Inspected by: Date:
Product Care and Maintenance
Parts List
PART #
DESCRIPTION
Western Red Cedar will turn a
weathered grey if left unfinished.
Although no finish is required for
cedar when used outdoors, a natural
oil finish applied regularly will help
maintain the beauty and minimize
cracking and drying. It is
recommended to use Gronomics
Garden Bed Oil (Item # GBO-1Q), a
non-toxic, food safe finish that is very
easy to apply.Apply Oil when air and
wind temperatures are between
50-90degrees. Avoid applying in
direct sunlight.
1450TL
www.gronomics.com East Bethel, MN USA 763-753-7374
6
Bottom Board and Fabric Installation
Place one 15-1/2” x 4-1/2” corner notched bottom board (Item 6) on each
end of the planter box.
Place the one 15-1/2” x 5-1/2” bottom board (Item 7) into the planter box.
(Gap boards evenly to allow for water drainage).
Install fabric liner into the planter box.
Soil Capacity: 1.5 Cubic Feet
3
Side Rail Assembly Continued
Install the two 14-1/2” x 5-1/2” side rails (Item 3) into the slots and slide
to the bottom of the slots.
3
3
4
Narrow Center Side Rail Assembly
Install the four 14-1/2” x 2-1/2” narrow center side rails (Item 5) into the
slots and slide down.
5
Final Side Rail Assembly
Install the 14-1/2” x 5-1/2” side rail w/logo (Item 4) and slide down.
Install the remaining 14-1/2” x 5-1/2” side rails (Item 3) and slide down.
5
5
3
Logo
4
3
7
6
7
Post Cap Assembly
Remove the rubber cap from the corner posts studs.
Align the hole of the 4” x 4” post cap (Item 8) with stud and tighten until
the cap makes contact with the post.
NOTE: Do not overtighten.
Repeat procedure on all posts.
Rubber Cap
Stud
8
  • Page 1 1
  • Page 2 2

Gronomics PB 18-18S Instrukcja obsługi

Typ
Instrukcja obsługi
Niniejsza instrukcja jest również odpowiednia dla

w innych językach