Gronomics EGBD 24-48 Assembly Instructions

Typ
Assembly Instructions
www.gronomics.com East Bethel, MN USA 763-753-7374
Continued
Parts List
ITEM QTY. PART # DESCRIPTION
1 4 3200E Corner Post, 4x 4” x 32” w/12-3/4” Dovetail Depth
2 2 4502T
3 4 2100T
4 2 4501T
5 2 2101T
Side Rail w/Cleat, 45” x 5-1/2” x 1”
Side Rail, 21” x 5-1/2” x 1”
Side Rail Narrow Center, 45” x 2-1/2” x 1
Side Rail Narrow Center, 21” x 2-1/2” x 1”
6 2 4500T, 4500TL Side Rail (one w/Logo), 45” x 5-1/2” x 1”
7 2 2178N Corner Notched Bottom Board, 22” x 5-1/2” x 1”
8 6 2178
944545
10 1FL3652
Bottom Board, 22” x 5-1/2” x 1
Post Cap, 4” x 4” x 1-1/2”
Fabric Liner, 36” x 52”
1
Parts Identi cation
Stack matching pieces in piles. Using the parts list, locate
and count the individual pieces and verify that you have
received the correct number of pieces.
If any pieces are missing or replacement parts
are required, contact Gronomics at
1-855-299-6727.
NOTE: Ground preparation is optional, however we
recommend leveling area under frame of product, or
place product directly on a flat level surface before
filling with soil.
Elevated Garden Bed (24” x 48”)
Assembly Instruction
Item #: EGBD 24-48
Item #: EGBD 24-48S
5
6
89
3
4
7
1
10
10
Packaged & Inspected by: Date:
2
Side Rail Assembly
2
Stand two 4” x 4” x 32” corner posts (Item 1) upright with slots facing you
and slots facing each corner post.
Locate a 45” x 5 1/2 “ side rail w/cleat (Item 2). With the cleat located at the
bottom and facing you, install side rail w/cleat into the slots and slide down
to the bottom of the slots.
Repeat procedure for the two remaining corner posts and 45” x 5-1/2 “ side
rail w/cleat.
Cleat
1 1
2
Parts List Product Care & Maintenance
Western Red Cedar will turn a
weathered grey if left unfinished.
Although no finish is required for cedar
products when used outdoors, a
natural oil finish applied regularly will
help maintain the beauty and minimize
cracking and drying. It is
recommended to use Gronomics
Garden Bed Oil (Item # GBO-1Q), a
non-toxic, food safe finish that is very
easy to apply. Apply Oil when air and
wind temperatures are between
50-90degrees. Avoid applying in
direct sunlight.
www.gronomics.com East Bethel, MN USA 763-753-7374
Install two 21” x 5-1/2” side rails (Item 3) (with the groove down) into the
slots and slide down to the bottom of the slots.
5
Bottom Board and Fabric Installation
Place one 22” x 4-1/2” corner notched bottom board (Item 7) on each
end of the garden bed.
Place six 22” x 4-1/2” bottom boards (Item 8) into the garden bed. (Gap
boards evenly to allow for water drainage).
Place fabric liner into the garden bed.
Soil Capacity: 5.9 Cubic Feet.
3
End Rail Assembly
3
3
7
8
4
Final Side Rail Assembly
Install two 45” x 5-1/2” side rails (Item 6) (one w/Logo) into the slots on
each side of the garden bed and slide down.
Install two 21” x 5-1/2” side rails (Item 3) into the slots on each end of
the garden bed and slide down.
NOTE: Make sure the boards tongue and grooves fully seat together.
Logo
63
3
4
Narrow Center Side Rail Assembly
Install two 45” x 2-1/2” side rails (Item 4) into the slots on each side of
the garden bed and slide down.
Install two 21” x 2-1/2” side rails (Item 5) into the slots on each end of
the garden bed and slide down.
NOTE: Make sure the boards tongue and grooves fully seat together.
45
56
Post Cap Assembly
Remove the rubber cap from the corner posts studs.
Align the hole of the 4” x 4” post cap (Item 9) with stud and tighten until
the cap makes contact with the post.
NOTE: Do not overtighten.
Repeat procedure on all posts.
Rubber Cap
Stud
9
  • Page 1 1
  • Page 2 2

Gronomics EGBD 24-48 Assembly Instructions

Typ
Assembly Instructions

w innych językach