Parts List
ITEM QTY. PART # DESCRIPTION
1 1 2003 Fabric Liner, 36” x 52”
2 4 3100 Post Cap, 4” x 4” x 1-1/2”
3 2 1201 Corner Notched Bottom Board, 22” x 5-1/2” x 1”
4 6 1200 Bottom Board, 22” x 5-1/2” x 1”
5 4 7007 Side Rail, 21” x 5-1/2” x 1”
6 2 4501, 4501L Side Rail (one w/Logo), 45” x 5-1/2” x 1”
7 2 7011 Side Rail w/Cleat, 45” x 5-1/2” x 1”
8 4 7012 Corner Post, 4” x 4” x 30” w/11” Dovetail Depth
1
Parts Identi cation
Stack matching pieces in piles. Using the parts list, locate
and count the individual pieces and verify that you have
received the correct number of pieces.
If any pieces are missing or replacement parts are
required, contact Gronomics at 1-855-299-6727.
NOTE: It is recommended to place a protective layer
between the ground and the pieces during assembly. This
will help prevent damage to the pieces.
Elevated Garden Bed (24” x 48”)
Assembly Instruction
ITEM #: EGB 24-48
ITEM #: EGB 24-48S
5
6
8
3
4
7
1
2
Packaged & Inspected by: Date:
Side Rail Assembly
2
Stand two 4” x 4” x 30” corner posts (Item 8) upright with slots facing you
and slots facing each corner post.
Locate a 45” x 5 1/2 “ side rail w/cleat (Item 7). With cleat located at the
bottom and facing you, install side rail w/cleat into the slots and slide down
to the bottom of the slots.
Repeat procedure for the two remaining corner posts and 45” x 5-1/2 “ side
rail w/cleat.
(Soil depth option: Cleats located as shown will provide a soil depth of
approximately 8”. Reverse side rail w/cleat installation, cleats located at top,
if a soil depth of approximately 6” is desired).
7
Cleat
8 8
www.gronomics.com East Bethel, MN USA 763-753-7374
5
Bottom Board and Fabric Installation
Place one 22” x 5-1/2” corner notched bottom board (Item 3) on each
end of the garden bed.
Place six 22” x 5-1/2” bottom boards (Item 4) into the garden bed. (Gap
boards evenly to allow for water drainage).
Place fabric liner into the garden bed.
Soil Capacity: 4.7 Cubic Feet
3
End Rail Assembly
Install two 21” x 5-1/2” side rails (Item 5) into the slots and slide down to
the bottom of the slots.
4
Final Side Rail Assembly
Install two 45” x 5-1/2” side rails (Item 6) into the slots on each side of
the garden bed and slide down. (Side rail with Logo located to outside).
Install two 21” x 5-1/2” side rails (Item 5) into the slots on each end of the
garden bed and slide down.
5
5
5
6
5
Logo
6
3
4
6
Post Cap Assembly
Remove the rubber cap from the corner posts studs.
Align the hole of the 4” x 4” post cap (Item 2) with stud and tighten until
the cap makes contact with the post.
NOTE: Do not overtighten.
Repeat procedure on all posts.
Rubber Cap
Stud