Gronomics REGB 24-48 Assembly Instructions

Typ
Assembly Instructions
www.gronomics.com East Bethel, MN USA 763-753-7374
Continued
1
Parts Identi cation
Stack matching pieces in piles. Using the parts
list, locate and count the individual pieces and
verify that you have received the correct number
of pieces.
If any pieces are missing or replacement parts are
required, contact Gronomics at 1-855-299-6727.
NOTE:Ground preparation is optional, however
we recommend leveling area under frame of
product, or place product directly on a flat level
surface before filling with soil.
Rustic Elevated Garden Bed
(24” x 48”) Assembly Instruction
Item #: REGB 24-48
1
23456
8
7
ITEM QTY.
Parts List
1 4
2 2
PART #
3200E
R4502
Corner Post, 4” x 4” x 32” w/12-3/4” Dovetail Depth
Side Rail w/Cleat, 45” x 5-1/2” x 1”
3 2 R4500, R4500L Side Rail (one w/Logo), 45” x 5-1/2” x 1”
4 4
5 2
6 6
7 4
R2100
2178N
2178
4545
Side Rail, 21” x 5-1/2” x 1”
Corner Notched Bottom Board, 22” x 5-1/2” x 1
Bottom Board, 22” x 5-1/2” x 1”
Post Cap, 4” x 4” x 1-1/2”
8 1 FL3652 Fabric Liner, 36” x 52
Side Rail Assembly
2
Stand two 4” x 4” X 30” corner posts (Item 1) upright with slots facing
you and slots facing each corner post.
Locate a 45” x 5-1/2” side rail w/cleat (Item 2). With cleat located at the
bottom and facing you, install side rail w/cleat into the slots and slide
down to the bottom of the slots.
Repeat procedure for the two remaining corner posts and 45” x 5-1/2”
side rail w/cleat.
(Soil depth option: Cleats located as shown will provide
a soil depth of approximately 9”. Reverse side rail w/
cleat installation, cleats located at top, if a soil depth of
approximately 6” is desired).
2
Cleat
1 1
Packaged & Inspected by: Date:
DESCRIPTION
Product Care and Maintenance
Western Red Cedar will turn a weathered
grey if left unfinished. Although no finish is
required for cedar when used outdoors, a
natural oil finish applied regularly will help
maintain the beauty and minimize cracking
and drying. It is recommended to use
Gronomics Garden Bed Oil (Item#
GBO-1Q), a non-toxic, food safe finish that
is very easy to apply.
Apply oil when air and wind temperatures
are between 50-90 degrees. Avoid applying
in direct sunlight.
www.gronomics.com East Bethel, MN USA 763-753-7374
6
Post Cap Assembly
5
Bottom Board and Fabric Installation
Place one 22” x 5-1/2” corner notched bottom board (Item 5) on each
end of the garden bed.
Place six 22” x 5-1/2” bottom boards (Item 6) into the garden bed. (Gap
boards evenly to allow for water drainage).
Install fabric liner into the planter box.
Soil Capacity: 5.4 Cubic Feet
Remove the rubber cap from the corner posts studs.
Align the hole of the 4” x 4” post cap (Item 7) with stud and tighten until
the cap makes contact with the post.
NOTE: Do not overtighten.
Repeat procedure on all posts.
3
End Rail Assembly
Install two 21” x 5-1/2” side rails (Item 4) into the upper part of the slots
on the two corner posts and slide down to the bottom of the slots.
4
4
4
Final Side Rail Assembly
Install two 45” x 5-1/2” side rails (Item 3) (one with logo) into the slots on
each side of the garden bed and slide down. (Side rail with Logo located
to outside).
Install two 21” x 5-1/2” side rails (Item 4) into the slots on each end of the
garden bed and slide down.
4
3
34
Logo
5
6
Rubber Cap
Stud
7
  • Page 1 1
  • Page 2 2

Gronomics REGB 24-48 Assembly Instructions

Typ
Assembly Instructions

w innych językach