jbc RHB Instrukcja obsługi

Typ
Instrukcja obsługi
RHB
Rework Hand Support for PHBK
INSTRUCTION MANUAL
www.jbctools.com
Hand
Support Arm .................... 1 unit
Ref. HRR-A
Height
Adjustment Flange .... 1 unit
Ref. 0023991
Shaft ........................ 1 unit
Base PHB compatible ............................ 1 unit Headless Screw .............................................. 1 unit
Ref. 0 017057
Allen key ...................................................... 1 unit
Ref. 0013609
Manual ......................................................... 1 unit
Ref. 0028767
Packing List
The following items are included:
This manual corresponds to the following reference:
RHB-A
2
R
R
R
R
L
L
R
R
L
L
R
R
L
L
L
L
R
R
L
L
JTT
JTT
JTT
JTT
JTT
R
R
R
R
L
L
R
R
L
L
R
R
L
L
L
L
R
R
L
L
JTT
JTT
JTT
JTT
JTT
Headless Screw
(at the back)
Shaft
Base
Bushing
Height
Adjustment
Flange
Hand Support
Arm
Bottom View
Right Hand
Support
Hand Supprt
Arm
Height Adjustment Knob
Shaft
Base
Hand Support
Features
Headless
Screw
Assembly
ESD Connector
(connect to ESD
Common Grounding
Point)
Setting up the Hand Support
Arm
Fit the shaft into the base bushing
(1) and tighten the headless screw
(2). Then assemble first the height
adjustment flange (3) and finally the
hand support arm (4) onto the shaft.
The hand support arm position
should be as shown in the image.
The right hand support ist marked at
its bottom side with the letter “R”.
1
2
3
4
www.jbctools.com
3
R
R
R
R
L
L
R
R
L
L
R
R
L
L
L
L
R
R
L
L
JTT
JTT
JTT
JTT
JTT
In case of using both left and right arms, assemble both as shown in the illustration according to the
letters on the back of the hand support, to keep the hand supports at the same level.
Accessories*
If a second hand support ist need, Left Hand Support HRL is available. HRL also allows adjustment
for different positions.
HRL
Left Hand Support
HRL
Rework Left Hand Support
HRR
Rework Right Hand Support
Bottom View
Bottom View
Mark for left hand
support
Mark for right hand
support
* Not included, sold separately.
R
R
R
R
L
L
R
R
L
L
R
R
L
L
L
L
R
R
L
L
JTT
JTT
JTT
JTT
JTT
R
R
R
R
L
L
R
R
L
L
R
R
L
L
L
L
R
R
L
L
JTT
JTT
JTT
JTT
JTT
R
R
R
R
L
L
R
R
L
L
R
R
L
L
L
L
R
R
L
L
JTT
JTT
JTT
JTT
JTT
R
R
R
R
L
L
R
R
L
L
R
R
L
L
L
L
R
R
L
L
JTT
JTT
JTT
JTT
JTT
R
R
R
R
L
L
R
R
L
L
R
R
L
L
L
L
R
R
L
L
JTT
JTT
JTT
JTT
JTT
Work Position Adjustment
RHN arm allows adjustment for different positions according to your work needs. The articulated
arm covers all work areas.
Position the arm and tighten the knobs.
The correct hand work posion ist shown in the following images:
Knob
Height Adjustment
According to your work needs the hand support
arm allows adjustment for different heights
through the vertical axis.
Slide the arm to the appropriate height (1) and
secure by tightening the knob (2) to guarantee
stability.
Arm
1
2
4
R
R
R
R
L
L
R
R
L
L
R
R
L
L
L
L
R
R
L
L
JTT
JTT
JTT
JTT
JTT
In case of using both left and right arms, assemble both as shown in the illustration according to the
letters on the back of the hand support, to keep the hand supports at the same level.
Accessories*
If a second hand support ist need, Left Hand Support HRL is available. HRL also allows adjustment
for different positions.
HRL
Left Hand Support
HRL
Rework Left Hand Support
HRR
Rework Right Hand Support
Bottom View
Bottom View
Mark for left hand
support
Mark for right hand
support
* Not included, sold separately.
www.jbctools.com
5
HRR and HRL can be combined with RWT, RWS or RWB.
Assemble first the height adjustment flange (1), then the HRR (2) and afterwards the HRL (3). Assemble
the second height adjustment flange (4) and finally the RWT (5).
Compatible JBC Articles*
* Not included, sold separately.
RWT
Rework Ajustable Arm
Without Base
4 different sizes for PCB Supports are available:
- PHNK Nano Preheater Set
- PHSK Small Preheater Set
- PHBK Large Preheater Set
- PHXK XL Preheater Set
HRL
Rework Left Hand Support
HRR
Rework Right Hand Support
Place the preheater set
in the area below the
hot air tool
Heights Adjustmet
Flange (1st)
Heights Adjustmet
Flange (2nd)
6
Sliding Parts
Maintenance
- Check periodically that RHS is clean,
especially the sliding parts and the shaft.
- Use a damp cloth when cleaning. Alcohol
can only be used to clean the metal parts.
- Replace any defective damaged parts.
Use original JBC spare parts only.
Not leave up RHN over the preheater
when the preheater is working.
Safety
- Do not use the equipment for any purpose other than PCB rework.
- The temperature of accessible surfaces may remain high after the unit is turned off. Handle with care.
- Be careful with the fumes produced when soldering.
- Keep your workplace clean and tidy. Wear appropriate protection glasses and gloves when
working to avoid personal harm.
- Not leave up the arms directly above heat surfaces.
- Utmost care must be taken with liquid tin waste which can cause burns.
- This appliance can be used by children over the age of eight as well as persons with reduced
physical, sensory or mental capabilities or lacking experience provided that they have been given
adequate supervision or instruction concerning use of the appliance and understand the hazards
involved. Children must not play with the appliance.
- Maintenance must not be carried out by children unless supervised.
It is imperative to follow safety guidelines to prevent electric shock, injury,
fire or explosions.
Shaft
www.jbctools.com
7
This product should not be thrown in the garbage.
In accordance with the European directive 2012/19/EU, electronic equipment at the end of its life must
be collected and returned to an authorized recycling facility.
Warranty
JBC’s 2 year warranty covers this equipment against
all manufacturing defects, including the replacement
of defective parts and labour.
Warranty does not cover product wear or misuse.
In order for the warranty to be valid, equipment must
be returned, postage paid, to the dealer where it was
purchased.
40 mm
50 mm
60 mm
80 mm
100 mm
130 mm 130 mm
para manuales - color gris
200 mm
300 mm
0023891-200522
Specifications
RHB
Rework Hand Support for PHNK
Ref. RHB-A
- Base Dimensions: 480 x 550 mm / 18.9 x 21.7 in
- Total Height: 205 mm / 8.07 in
- Arm Height: 200 mm / 7.87 in
- Arm Lenght: 498 mm / 19.61 in
- ESD Connector
- Total Net Weight: 12.13 kg / 26.74 lb
- Package Dimension / Weight: 595 x 525 x 185 mm / 14.17 kg
(L x W x H) 23.43 x 20.67 x 7.28 / 31.24 lb
Complies with CE standards
ESD Safe
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8

jbc RHB Instrukcja obsługi

Typ
Instrukcja obsługi

w innych językach