Gronomics PB 18-48 Assembly Instructions

Typ
Assembly Instructions
www.gronomics.com East Bethel, MN USA 763-753-7374
Continued
ITEM QTY. PART #
1 4 1900P
2 2 4502T
3 1 4500TL
4 1 4500T
5 2 4501T
6 2 1451T
7 4 1450T
8 2 1538N
9 6 1538
10 4
11 1 FL3652
Description
Corner Post, 4” x 4” x 19”W/ 2 DOVETAILED SIDES12-3/4"
Side Rail w/Cleat, 45” x 5-1/2” x 7/8
Side Rail w/Logo, 45” x 5-1/2” x 7/8
Side Rail, 45” x 5-1/2” x 7/8
Narrow Center Side Rail, 45-1/2” x 2-1/2” x 7/8
Narrow Center Side Rail, 14-1/2” x 2-1/2” x 7/8
Side Rail, 14-1/2” x 5-1/2” x 7/8
Corner Notched Bottom Board, 15” x 5-3/8” x 1”
Bottom Board, 15-3/8” x 5-1/2” x 1”
Post Cap, 4-5/8” x 4-5/8” x 1-1/2”
Fabric Liner, 36"x 52"
Planter Box (18” x 48”)
Assembly Instruction
1
Parts Identi cation
Stack matching pieces in piles. Using the parts list, locate and
count the individual pieces and verify that you have received
the correct number of pieces.
If any pieces are missing or replacement parts are
required, contact Gronomics at 1-855-299-6727.
NOTE: Ground preparation is optional, however we
recommend leveling area under frame of product, or place
product directly on a flat level surface before filling with soil.
Item #: PB 18-48
Item #: PB 18-48S
678
9
11
11
10
10
234 5
1
Packaged & Inspected by: Date:
Side Rail Assembly
2
Stand two 4” x 4” x 19” corner posts (Item 1) upright with slots facing each post and slots
facing you.
Locate a 14-1/2” x 5-1/2” side rail w/cleat (Item 2). With cleat located at the bottom and
facing you, install side rail w/cleat into the slots and slide down to the bottom of the slots.
Repeat procedure for the two remaining 4” x 4” x 19” corner posts and 14-1/2” x 5-1/2”
side rail w/cleat.
(Soil depth option: Cleats located as shown will provide a soil depth of
approximately 10”. Reverse side rail w/cleat installation, cleats located at
top, if a soil depth of approximately 6” is desired).
Cleat
2
11
Parts List Product Care and Maintenance
Western Red Cedar will turn a
weathered grey if left unfinished.
Although no finish is required for
cedar when used outdoors, a
natural oil finish applied regularly
will help maintain the beauty and
minimize cracking and drying. It is
recommended to use Gronomics
Garden Bed Oil (Item # GBO-1Q), a
non-toxic, food safe finish that is
very easy to apply. Apply Oil when
air and wind temperatures are
between 50-90degrees. Avoid
applying in direct sunlight.
4545
www.gronomics.com East Bethel, MN USA 763-753-7374
6
Bottom Board and Fabric Installation
Place one 15” x 5-1/2” x corner notched bottom board (Item 8) on each
end of the planter box.
Place six 15” x 5-1/2” bottom boards (Item 9) into the planter box. (Gap
boards evenly to allow for water drainage).
Install fabric liner into the planter box.
Soil Capacity: 4.3 Cubic Feet
3
End Rail Assembly
Install the two 14-1/2” x 5-1/2” side rails (Item 7) into the slots and slide
to the bottom of the slots.
4
Narrow Center Side Rail Assembly
Install the two 45” x 2-1/2” narrow center side rails (Item 5) into the slots
and slide down.
Install the two 14-1/2” x 2-1/2” narrow center side rails (Item 6) into the
slots and slide down.
5
Final Side Rail Assembly
Install the 45” x 5-1/2” side rail w/logo (Item 3) and 45” x 5-1/2” side rail
(Item 4) and slide down.
Install the remaining 14-1/2” x 5-1/2” side rails (Item 7) into the slots and
slide down.
7
7
6
5
6
7
7
3
Logo
4
8
9
7
Post Cap Assembly
Remove the rubber cap from the corner posts studs.
Align the hole of the 4” x 4” post cap (Item 10) with stud and tighten until
the cap makes contact with the post.
NOTE: Do not overtighten.
Repeat procedure on all posts.
Rubber Cap
Stud
10
10
  • Page 1 1
  • Page 2 2

Gronomics PB 18-48 Assembly Instructions

Typ
Assembly Instructions

w innych językach