Cooper Lighting ADY071458 Instrukcja obsługi

Typ
Instrukcja obsługi

Niniejsza instrukcja jest również odpowiednia dla

Securing the fixture in drywall
Securing fixture to ceiling tile
Semi-recessed fixtures shown without thermal protectors
Warning
: Before starting any work ensure
that all sources of power are turned off. All
work must meet local/national codes and be
performed by a certified electrician.
Do not
mount fixtures vertically.
Installation Instructions
Vault w/ visor C-Scroll w/ visor Roundel w/ visor
These installation instructions are valid with the above Ametrix styles.
2.
3.
Sheet 2 of 4
Small, INDOOR
SRI
(Semi-Recessed, Integral ballast)
Visor and Non-Visor
ADY071458 REV A (ECN070344)
3.
2.
Fixture
assembly
Ceiling tile
Universal
bracket
#10-32 x3/8"
Pan head screw
(4x)
1.
If possible, remove ceiling tile from grid to facilitate fixture
installation.
2.
Using cut out dimensions provided on page four(4), cut
appropriate size opening in ceiling tile.
3.
Insert fixture assembly into cut out in ceiling tile.
1.
Using cut out dimensions provided on page four(4), cut
hole into dry wall and feed power wire to hole.
2.
After removing fixture head, loosen #10-32 x3/8" Pan head
screws and remove cover plate closest to power feed.
3.
Knock out appropriate hole for conduit and attach as shown
on page three(3).
4.
Replace cover plate and secure with #10-32 x3/8" Pan head
screws and press fixture housing into hole in drywall.
Wiring the fixture
(drywall)
Cover plate
Conduit from
power source.
(by others)
Fixture housing
#10-32 x3/8"
Pan head screws
(2x)
#10-32 x 3/8"
Pan head screws
(4x)
Universal brackets
(2x)
Replacing brackets on fixture housing
(ceiling grid)
1.
Loosely reattach brackets to both sides of fixture housing.
2.
Press brackets flush to ceiling tile and secure using #10-32 x
3/8".
1.
Prior to pushing fixture into hole in drywall, tie off fixture
housing to structure using saftey wire(by others) as show on
page three(3).
2.
Gently push fixture housing into hole and tighten 1/4-20 x 1
1/2" Pan head screw from inside fixture housing to tighten
drywall bracket around drywall.
3.
Connect appropriate wires from fixture head and ensure all
wires are properly matched.
4.
Replace fixture head assembly on keyhole screws and
tighten.
1/4-20 x1 1/2"
Pan head screw
Safety wires
(by others)
(4x)
Choose appropriate cover plate
depending on location of power
source.
Ceiling surface
#10-32 x3/8"
Pan head screw
(2x)
Wiring the fixture
(both ceiling grid and drywall)
Warning
: Before starting any work ensure
that all sources of power are turned off. All
work must meet local/national codes and be
performed by a certified electrician.
Do not
mount fixtures vertically.
Installation Instructions
Vault w/ visor C-Scroll w/ visor Roundel w/ visor
These installation instructions are valid with the above Ametrix styles.
4.
5.
Sheet 3 of 4
Small, INDOOR
SRI
(Semi-Recessed, Integral ballast)
Visor and Non-Visor
ADY071458 REV A (ECN070344)
Securing the fixtures with safety wire
(both ceiling grid and drywall)
1.
If applicable,
replace ceiling tile with fixture secured back into ceiling. Remove adjacent tile from ceiling to facilitate wiring.
2.
Depending on location of power source, loosen #10-32 x3/8" Pan head screws and remove appropriate cover plate and
knock out appropriate hole.
3.
Using conduit fitting and washer, secure conduit to cover plate.
4.
Attach appropriate wires and ensure all connections are properly matched.
5.
Replace cover plate and secure with #10-32 x3/8" Pan head screws.
Semi-recessed fixtures shown without thermal protectors
1.
After securing fixture housing to ceiling structure using provided brackets, reinforce fixture using safety wire(by others).
2.
Using all four tabs located on corners of fixture housing, tie off fixture to structure using safety wire(by others).
Cover plate
Conduit
(by others)
Conduit fitting
(by others)
Conduit Nut
(by others)
Safety wire
(by others)
Fixture housing
10 3/4" Fixture head size
12 3/4" Fixture head size
Lamping Size Chart
1
357.19
16
14 "
6
1
2
"
165.10
(lamps provided by others)
Cutout Dimensions In[mm]
1
292.10
2
11 "
6
1
2
"
165.10
Semi-recessed fixtures shown without thermal protectors
Installation Instructions
Vault w/ visor
C-Scroll w/ visor
Roundel w/ visor
These installation instructions are valid with the above Ametrix styles
Warning
: Before starting any work ensure
that all sources of power are turned off. All
work must meet local/national codes and be
performed by a certified electrician.
Do not
mount fixtures vertically.
Small, INDOOR
SRI
(Semi-Recessed, Integral ballast)
Visor and Non-Visor
Sheet 4 of 4
ADY071458 REV A (ECN070344)
FIXTURE SIZE
(inches/ mm)
WATTAGE
# OF
LAMPS
LAMP TYPE LAMP DESCRIPTION
10
3/4
/ 273.05 39 W 1 T6 Ceramic Metal Halide
12
3/4
/ 323.85 70 W 1 T6 Ceramic Metal Halide
12
3/4
/ 323.85 150 W 1 T6 Ceramic Metal Halide
12
3/4
/ 323.85 26 W 1 T4 Compact Flourescent
10
3/4
/ 273.05 100 W 1 T4 Halogen(Single Ended)
12
3/4
/ 323.85 150 W 1 T4 Halogen(Single Ended)
12
3/4
/ 323.85 250 W 1 T4 Halogen(Single Ended)
LAMP
(not to scale)
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Cooper Lighting ADY071458 Instrukcja obsługi

Typ
Instrukcja obsługi
Niniejsza instrukcja jest również odpowiednia dla

w innych językach