Gronomics PB 18-34 Assembly Instructions

Typ
Assembly Instructions
www.gronomics.com East Bethel, MN USA 763-753-7374
Continued
ITEM QTY. PART #
1 4 1900P
2 2 3102T
Corner Post, 4” x 4” x 19” w/2 dovetailed sides 12-3/4
Side Rail w/Cleat, 31” x 5-1/2” x 7/8
3 2 3100T ,3100TL Side Rail, (one w/Logo), 31” x 5-1/2” x 7/8
4 2 3101T
5 4 1450T
6 2 1451T
7 4 1538
8 2 1538NR
9 4 4545
10 1 FL3652
Narrow Center Side Rail, 31” x 2-1/2” x 7/8
Side Rail, 14-1/2” x 5-1/2” x 7/8
Narrow Center Side Rail, 14-1/2” x 2-1/2” x 7/8
Bottom Board, 15-3/8” x 5-1/2” x 1”
Corner Notched & ripped Bottom Board, 15” x 4-1/2” x 1”
Post Cap, 4-5/8” x 4-5/8” x 1-1/2”
Fabric Liner, 36"x 52"
Planter Box (18” x 34”)
Assembly Instruction
1
Parts Identif cation
Stack matching pieces in piles. Using the parts list, locate
and count the individual pieces and verify that you have
received the correct number of pieces.
If any pieces are missing or replacement parts are
required, contact Gronomics at 1-855-299-6727.
NOTE: Ground preparation is optional, however we
recommend leveling area under frame of product, or
place product directly on a flat level surface before filling
with soil.
Item #: PB 18-34
Item #: PB 18-34S
1
234
56
78
10
10
9
Side Rail Assembly
2
Stand two 4” x 4” x 19” corner posts........... (Item 1) upright with slots
facing each post and slots facing you.
Locate a 31” x 5-1/2” side rail w/cleat (Item 2). With cleat located at the bottom
and facing you, install side rail w/cleat into the slots and slide down to the bottom
of the slots.
Repeat procedure for the two remaining 4” x 4” x 19” corner posts w/ Dovetail and
31” x 5-1/2” side rail w/cleat.
(Soil depth option: Cleats located as shown will provide a soil depth
of approximately 10”. Reverse side rail w/cleat installation, cleats
located at top, if a soil depth of approximately 6” is desired). Cleat
2
11
Packaged & Inspected by: Date:
DESCRIPTION
Product Care and Maintenance
Western Red Cedar will turn a
weathered grey if left unfinished.
Although no finish is required for
cedar when used outdoors, a
natural oil finish applied regularly
will help maintain the beauty and
minimize cracking and drying. It is
recommended to use Gronomics
Garden Bed Oil (Item # GBO-1Q), a
non-toxic, food safe finish that is
very easy to apply. Apply Oil
when air and wind temperatures
are between 50-90degrees.
Avoid applying in direct sunlight.
Parts List
www.gronomics.com East Bethel, MN USA 763-753-7374
6
Bottom Board and Fabric Installation
Place one 15-3/8-” x 4-1/2” corner notched & ripped bottom
board (Item 8) on each end of the planter box.
Place the four 15-3/8” x 5-1/2” bottom boards (Item 7) into the
planter box. (Gap boards evenly to allow for water drainage).
Install fabric liner into the planter box.
Soil Capacity: 3 Cubic Feet
3
End Side Rail Assembly
Install the two 14-1/2” x 5-1/2” side rails (Item 5) into the slots and slide
to the bottom of the slots.
4
Narrow Center Side Rail Assembly
Install the two 31” x 2-1/2” narrow center side rails (Item 4) into the slots
and slide down.
Install the two 14-1/2” x 2-1/2” narrow center side rails (Item 6) into the
slots and slide down.
5
Final Side Rail Assembly
Install the remaining 31” x 5-1/2” side rails (Item 3) (one w/ logo) and
slide down.
Install the remaining 14-1/2” x 5-1/2” side rails (Item 5) into the slots and
slide down.
5
5
6
4
6
5
5
3
Logo
8
8
7
7
Post Cap Assembly
Remove the rubber cap from the corner posts studs.
Align the hole of the 4” x 4” post cap (Item 9) with stud and tighten until
the cap makes contact with the post.
NOTE: Do not overtighten.
Repeat procedure on all posts.
Rubber Cap
Stud
9
  • Page 1 1
  • Page 2 2

Gronomics PB 18-34 Assembly Instructions

Typ
Assembly Instructions

w innych językach