Gaggia Vetro Instrukcja instalacji

Typ
Instrukcja instalacji
The installaon area is clean and clear of dust and tools. It is not located in an acve construcon zone.
The counter accommodates the machine size and weight (check selected model).
An access hole has been pre-drilled in the counter for drainage and power in accordance with model installaon template.
Hole in counter is ed with a collar to protect electrical cord, water line & drain tube.
Machine can safely be installed with minimum clearances of 3'' from the back wall, 4'' on each side and 12'' on top.
GENERAL MACHINE ENVIRONMENT
WATER SPECIFICATIONS
ELECTRICAL REQUIREMENTS
Pressure & Hardness
Pressure is between 44 PSI & 116.03 PSI.
pH range is between 6.5 & 7.5.
Hardness (TDS) is between 89 PPM & 142 PPM.
Power outlet receptacle is NEMA 6-20R (2 groups models) or NEMA 6-30R (3 groups models).
Dedicated electrical circuit meets the selected Vetro model power requirements.
No extension cord or power strip on the circuit.
Model STANDARD Version TALL Version
2 Groups 3 Groups 2 Groups 3 Groups
Dimensions
(WxHxD) 28.7” x 18.5” x 20.9’’ 35.4” x 18.5” x 20.9’’ 28.7” x 20.5” x 20.9’’ 35.4” x 20.5” x 20.9’’
Weight 100 lb 137 lb 100 lb 137 lb
Power Cord Plug NEMA 6-20P NEMA 6-30P NEMA 6-20P NEMA 6-30P
Max Absorbed
Power 3700 W 4800 W 3700 W 4800 W
Voltage & Frequency 220 V / 60 Hz
Water Network
The water network provides cold, drinkable tap water.
Dedicated 3/8” diameter water line.
Shuto valve with a 3/8” G male pipe ng on machine’s end.
Machine water line is equipped with soness/ltraon system and descaling device.
INSTALLATION CHECKLIST
Vetro Installation Checklist | 2022-10
Evoca North America
2355, avenue Dalton, Québec (Québec) G1P 3S3 Canada
T: 800-561-6162 F: 800-463-2739
www.evocagroupna.com
HIGHLY RECOMMENDED: Connecon to a oor drain in accordance with local health code.
  • Page 1 1

Gaggia Vetro Instrukcja instalacji

Typ
Instrukcja instalacji

w innych językach