4. Podłączyć wyjście transformatora do zacisków (~AC) PCB, używając dołączonych przewodów
Uwagi: podłączyć wymagane napięcie U1 lub U2 dla danego urządzenia.
5. Wykonać opcjonalnie pozostałe połączenia wymagane dla danego typu urządzenia/systemu.
Uwagi: zgodnie z wymaganiami i zaleceniami producenta.
6. Wykonać uruchomienie (załączenie zasilania ~230V, akumulatora), regulacje lub konfiguracje: zgodnie
z procedurą producenta systemu
7. Po instalacji i uruchomieniu systemu należy zamknąć obudowę
1. Destination: EN
Enclosures of the AWO 220K series are designed as elements of Intrusion Detection Systems, Access Control
systems, etc.
They are designed for mounting of (depending on the model):
Alarm control panel and – optionally – additional modules
Controller of the Access Control system and additional modules
Radio or GSM transmitter, uninterruptible power supply unit as an option
Other dedicated devices
The AWO220K is a two-level enclosure. This solution provides additional capacity for more devices than in the standard
enclosure.
The lower level includes openings for control panels and expanders. Meanwhile, the upper level, in addition
to openings for expansion modules, has openings for communication modules including, among others:
GORKE – ATG; ROPAM – BASIC and MULTI GSM; SATEL – ETHM, GSM LT1, LT2, GPRS-T1/T2/T4
The upper part of the enclosure includes pre-embossed openings for GSM antennas.
The enclosure is recommended for mounting of Intrusion Detection Systems requiring – in addition to
standard elements, that is control panel and expanders - the installation of communication module.
2. Installation:
The metal casing (+PCB) must be installed by a qualified installer, holding the relevant certificates, required and
necessary in the particular country for connecting (interfering with) the 230 V AC systems and low-voltage installations.
Because the transformer is designed for the continuous operation and is not equipped with ON/OFF switch, the
power supply line should have the appropriate overload protection. The user should be informed how to disconnect the
unit from the mains (the most often by separate and mark the adequate fuse in the fuse box). The power supply
installation should be conform to the applicable standards and law.
The casing (+PCB) should be installed indoors, where the air humidity is normal (RH=90% max. without
condensation) and temperature in the range of -10°C to +40°C.
Caution! Prior to entering for installation it is necessary to make sure if the voltage
in the 230 V/AC circuit is disconnected.
All service works inside the housing must be carried out with 230V/AC supply voltage
disconnected.
1. Mount the PCB (control panel, etc) with dedicated holes (use distance pins, bracket screw).
2. Install metal casing in dedicated place and bring in the connecting (~230V) and signal conductors through cables
bushings.
Remarks: supply circuit ~230V should be carried out with three-core cable
(with yellow-green protective PE conductor).
3. Supply conductors ~230V should be connected to 230V / AC L-N terminals of the transformers.
Protective conductor should be connected to the terminal marked with grounding symbol.
Caution! Operating the power supply without properly made and technically
operational electric shock protection circuit is IMPERMISSIBLE!
This creates hazard of equipment damage and risk of electric shock.
4. Connect the output of transformer to the terminals (~AC) on the PCB, using installed cables
Remarks: connect required voltage U1 or U2 (secondary voltage) for the correct device.
5. If necessary, make other connections required for the correct type of system / device.